Camp IHC (formerly Indian Head Camp) in Equinunk, Pennsylvania transformed its waterfront with a 7,033 square foot aquatic complex that has become the heart of the summer camp experience. Completed in 2018 and designed by Main Line Commercial Pools, this multi-zone facility seamlessly integrates a competition pool for swim instruction and team activities with a leisure pool and climbing rock wall—creating an environment where campers of all skill levels can challenge themselves, build confidence, and create lasting memories.
The thoughtful design balances structured programming with free play, allowing camp staff to run swim lessons and competitive activities while other campers enjoy recreational water time and conquer the integrated rock wall. Main Line Commercial Pools’ comprehensive involvement—from initial design through construction—ensured the facility meets the unique demands of a seasonal camp environment, where safety, durability, and the ability to engage hundreds of energetic campers daily are paramount. The result is an aquatic centerpiece that embodies the adventure and growth that define the camp experience.
- Project Type
- Owner of Project
- Aquatic Designer
- Location
- Year Completed
- Project Features
- Size of Pool





